Endell Street, WC2
Duration 9 weeks
Value £800k
Designer Tom Dixon
Architect & C/A Emulsion
QS Measur
M&E Cameron Black
Project Description
- Complete strip out of existing bar space
- Removal of existing roof
- Installation of new steel & glass feature roof
- New M&E throughout
- Bespoke lighting
- Bespoke joinery
- Specialist wall, ceiling and floor finishes
- Full commercial kitchen installation
- LED signage and graphics
- Feature toilet areas
The project timescales were extremely tight and the project had to be handed over defect free to allow Circus to hold a number of high profile Christmas parties for the media industry. The complexity of the project required close liaison with the design team to resolve issues as the works progressed at pace. Careful planning was required for the new roof installation during periods of poor weather.